Project: 2112
Plant type: Pharma production plant
Location: Baselland
Project scope: Installation of a pharmaceutical production plant
Deliverables:
– Five reactors from STEM and stainless steel with a capacity of up to 4,000 liters, in serial connections with equipment and condensers
– Filter drier with glove box for filter cake recycling for highly-active products
– Circular distribution pipe in DN 50 with six connections
– The preliminary product is kneaded into a paste
– Distribution panel of a solvent distribution station with three serial, on measuring transducer mounted boiler vessels
– Material combination from stainless steel, STEM, steel PTFE and Hastelloy
Project timeframe: 2005 - 2006 (12 months)